外国美女色情片

Projet555 MAPLETON RD
Adresse555 MAPLETON RD MONCTON, NB E1G 2K5
Surintendant du sitePAULA BOURQUE
Entrepreneur g茅n茅ralNEWCO CONSTRUCTION
50 Rooney Crescent MONCTON NB E1E 4M3 CANADA
Ing茅nieur de projetJACK VANDERBROEK
855 Dieppe Blvd SUITE 3 DIEPPE NB E1A 7R8 Canada
Commentaires

STRUCTURAL STEEL MODIFICATIONS.
LINTELS, MISC METALS

Summit Steel Fabricators Inc. is certified to CSA Standard W47.1 鈥溚夤琅槠 of companies for fusion welding of steel鈥 in Division 2 and, therefore, does meet the requirements of CSA S16 Clause 24.3 which is referenced in the National & Provincial Building Codes Section 4.3.4.1.

NBCC Section 4.3.4.1: "Building and their structural members made of structural steel shall conform to CSA S16 鈥淒esign of Steel Structures.鈥

CSA S16 Clause 24.3: 鈥淔abricators and erectors responsible for welding structures fabricated or erected under this Standard shall meet the requirements of CSA W47.1, CSA W55.3 or both, as applicable in Division 1 or Division 2. Part of the work may be sublet to a Division 3 fabricator or erector; however, the Division 1 or Division 2 fabricator or erector shall retain responsibility for the sublet work.鈥

Contact sur le sitePAULA BOURQUE
Repr茅sentant de la CWBRon Stiles
Date2025-05-29